Refinery and Tank Farm Demolition
Demolition of a refinery tank farm in the UAE: large storage tanks, spherical vessels, pipe racks and process structures dismantled, foundations broken out.
Demolition · Decommissioning · Environmental services
AVR Demolition delivers industrial dismantling, remediation and landfill construction across the UAE — backed by three decades of the AVR Group in Germany.
About AVR Demolition
We are established on the market with a wide range of environmental services. We stand out through modern technologies, thorough planning and a high level of reliability for our clients.
Our core competencies include conventional and specialised deconstruction of old industrial facilities as well as the remediation of contaminated sites. Beyond land recycling we offer landfill construction and operation, civil and earthworks, and industrial services such as plant feeding, material processing, transport and facility cleaning.
Three decades of reliable, innovative environmental solutions worldwide.
Beyond Germany — sustainable solutions for clients across the Gulf region.
From analysis to implementation: complete environmental services from one source.
Services
Our projects
Demolition of a refinery tank farm in the UAE: large storage tanks, spherical vessels, pipe racks and process structures dismantled, foundations broken out.
Clearing the refinery relocation site: structures above and below ground, utilities and foundations demolished, concrete reused, site handed over fully cleared.
Site-wide decommissioning and disposal: pipes above and below ground, cables, foundations, piles and roads removed on the basis of a full site inspection.
Deconstruction of the old booster station at ASAB, including the gas heater and pipelines, followed by remediation works.
Excavation works, removal of industrial pipework and disassembly of plant structures at the BEAAT power plant.
Remediation of the refinery site with wells, drainage trenches and oil-skimming systems — 320,000 litres of oil recovered.
Internal cleaning of storage tanks at Taweelah Power Plant, including removal and disposal of the sludge.
Deconstruction of a chlorine plant with 150,000 m³ of building volume, remediation of mercury-contaminated materials and treatment of 20,000 tonnes of polluted soil.
Construction of a hazardous-waste landfill with asphalt base and surface sealing, a reactive sulphur layer, a slurry wall and a monitoring system.
Group references
Selected projects of AVR Group, Essen — the expertise behind AVR Demolition.
Marl
Bergkamen
Düsseldorf
Buchholz
Cologne
Careers
For our growing team we are looking for new talents and experienced professionals. Become part of AVR.
See open positionsContact
Tell us about your project — we respond within one business day.
We would like to use Google Analytics cookies to understand how visitors use this site. No data is sent to Google unless you agree. Privacy policy